Wastewater Lift Station Force Main Replacements

Share Wastewater Lift Station Force Main Replacements on Facebook Share Wastewater Lift Station Force Main Replacements on X (formerly Twitter) Share Wastewater Lift Station Force Main Replacements on Linkedin Email Wastewater Lift Station Force Main Replacements link

Overview

Force mains are pressurized pipes that use mechanical pumps to keep sewer water flowing through them. All pipes degrade over time, eventually needing repair or replacement. This construction is part of a larger project to install six new PVC and/or HDPE force main connections to lift stations (#1, 2, 4, 10, 12A, and 17) with all new valves, fittings, and appurtenances. The current cast-iron force mains range in age from 59-74 years of age.

Lift Station Locations

Location Map

  • Lift Station 1 - Edgewater Drive at Florida Ave. to Lyndhurst St.
  • Lift Station 2 - Edgewater Drive at President St.
  • Lift Station 4 - San Jose Drive at Santa Barbara Dr. to San Salvador Dr.
  • Lift Station 10 - New York Avenue at Wilkie St.
  • Lift Station 12A - Fairway Drive at Palm Blvd. to Demaret Dr.
  • Lift Station 17 - Fairway Drive at Mangrum Dr. to Armour Dr.

Current Lift Station Capacity and Usage

  • Lift Station 1 - replacing 1360 ft. of pipe, typically carries 73,000 gallons per day
  • Lift Station 2 - replacing 3340 ft. of pipe, typically carries 108,000 gallons per day
  • Lift Station 4 - replacing 1860 ft. of pipe, typically carries 101,000 gallons per day
  • Lift Station 10 - replacing 3080 ft. of pipe, typically carries 706,000 gallons per day
  • Lift Station 12A - replacing 1400 ft. of pipe, typically carries 89,000 gallons per day
  • Lift Station 17 - replacing 720 ft. of pipe, typically carries 40,000 gallons per day

Full Project Budget

This project utilizes a Pinellas County contract bid from August 2021

  • Lift Station 1 - $372,967.00
  • Lift Station 2 - $1,126,845.00
  • Lift Station 4 - $643,067.00
  • Lift Station 10 - $1,259,491.00
  • Lift Station 12A - $361,696.00
  • Lift Station 17 - $232,362.00
  • Design - $219,539

Project Total - $4,215,967 for all 6 lift station and force main replacements.

Completed Lift Stations

  • Lift Station 1
  • Lift Station 17
  • Lift Station 10 - Virginia Lane



Overview

Force mains are pressurized pipes that use mechanical pumps to keep sewer water flowing through them. All pipes degrade over time, eventually needing repair or replacement. This construction is part of a larger project to install six new PVC and/or HDPE force main connections to lift stations (#1, 2, 4, 10, 12A, and 17) with all new valves, fittings, and appurtenances. The current cast-iron force mains range in age from 59-74 years of age.

Lift Station Locations

Location Map

  • Lift Station 1 - Edgewater Drive at Florida Ave. to Lyndhurst St.
  • Lift Station 2 - Edgewater Drive at President St.
  • Lift Station 4 - San Jose Drive at Santa Barbara Dr. to San Salvador Dr.
  • Lift Station 10 - New York Avenue at Wilkie St.
  • Lift Station 12A - Fairway Drive at Palm Blvd. to Demaret Dr.
  • Lift Station 17 - Fairway Drive at Mangrum Dr. to Armour Dr.

Current Lift Station Capacity and Usage

  • Lift Station 1 - replacing 1360 ft. of pipe, typically carries 73,000 gallons per day
  • Lift Station 2 - replacing 3340 ft. of pipe, typically carries 108,000 gallons per day
  • Lift Station 4 - replacing 1860 ft. of pipe, typically carries 101,000 gallons per day
  • Lift Station 10 - replacing 3080 ft. of pipe, typically carries 706,000 gallons per day
  • Lift Station 12A - replacing 1400 ft. of pipe, typically carries 89,000 gallons per day
  • Lift Station 17 - replacing 720 ft. of pipe, typically carries 40,000 gallons per day

Full Project Budget

This project utilizes a Pinellas County contract bid from August 2021

  • Lift Station 1 - $372,967.00
  • Lift Station 2 - $1,126,845.00
  • Lift Station 4 - $643,067.00
  • Lift Station 10 - $1,259,491.00
  • Lift Station 12A - $361,696.00
  • Lift Station 17 - $232,362.00
  • Design - $219,539

Project Total - $4,215,967 for all 6 lift station and force main replacements.

Completed Lift Stations

  • Lift Station 1
  • Lift Station 17
  • Lift Station 10 - Virginia Lane