Overview
Our goal is to improve street stormwater drainage along Washington Street. This project focuses on the paved section between Broadway (ALT 19) and the unpaved portion to the west. This area frequently floods due to its low elevation and lack of proper drainage, relying solely on slow infiltration. The proposed improvements include installing a drainage inlet that connects to the adjacent FDOT stormwater pond, adding curbing, and reconstructing the paved portion of the street.
Why this is Important
This project resolved the previous roadway flooding by installing a new curb inlet to capture runoff and direct it into the adjacent FDOT pond. In addition, the entire street was reconstructed with a new road base, fresh asphalt paving, and new concrete curbs designed to channel water efficiently into the storm drain system.
This effort supports Dunedin as the premier coastal community by enhancing public infrastructure in a key coastal area. It also aligns to serve as a statewide model for environmental sustainability stewardship, by incorporating sustainable stormwater solutions that protect our natural resources and community well-being.
Overview
Our goal is to improve street stormwater drainage along Washington Street. This project focuses on the paved section between Broadway (ALT 19) and the unpaved portion to the west. This area frequently floods due to its low elevation and lack of proper drainage, relying solely on slow infiltration. The proposed improvements include installing a drainage inlet that connects to the adjacent FDOT stormwater pond, adding curbing, and reconstructing the paved portion of the street.
Why this is Important
This project resolved the previous roadway flooding by installing a new curb inlet to capture runoff and direct it into the adjacent FDOT pond. In addition, the entire street was reconstructed with a new road base, fresh asphalt paving, and new concrete curbs designed to channel water efficiently into the storm drain system.
This effort supports Dunedin as the premier coastal community by enhancing public infrastructure in a key coastal area. It also aligns to serve as a statewide model for environmental sustainability stewardship, by incorporating sustainable stormwater solutions that protect our natural resources and community well-being.
Project Bid Received
Washington Street Flooding has finished this stage
April 2025
Bid Review and Award Recommendation to Commission
Washington Street Flooding has finished this stage
Late April 2025 - May 2025
Pre-construction Meeting with Contractor
Washington Street Flooding has finished this stage
May 2025
Notice to Proceed Issuance
Washington Street Flooding has finished this stage
June 2025
Construction Phase
Washington Street Flooding has finished this stage
June 2025 - August 2025
Project Close-Out and Final Inspection
Washington Street Flooding is currently at this stage