Vegetation and Debris Removal from Citywide Drainage Channels
Share Vegetation and Debris Removal from Citywide Drainage Channels on Facebook
Share Vegetation and Debris Removal from Citywide Drainage Channels on X (formerly Twitter)
Share Vegetation and Debris Removal from Citywide Drainage Channels on Linkedin
Email Vegetation and Debris Removal from Citywide Drainage Channels link
The Curlew Creek, Jerry Branch, and Cedar Creek waterways stretch across approximately 6.5 miles of densely wooded terrain within the City of Dunedin's municipal boundaries. These vital drainage corridors serve multiple watersheds, helping to manage stormwater and prevent local flooding. As natural conveyance channels, they direct water safely through the landscape, ultimately discharging into various points along the Intracoastal Waterway that defines Dunedin’s scenic shoreline.
Project Elements:
- Removal a significant cubic yard of debris that has interrupted the continuous flow of water.
- Partnership with USDA Natural Resource Conservation Service (NRCS) and grant money allocation.
- Monitoring of the debris collected and disposed of for documentation with GPS coordinates and photographic evidence.
Project Budget:
- Total Project costs: About $1.4 million
- Funding Source: Stormwater Fund with grant funding through USDA Natrual Resource Conservation Service Emergency Watershed Protection.
Why?
- To maximize the efficiency of water conveyance across Dunedin’s major drainage channels—Curlew Creek, Jerry Branch, and Cedar Creek. By completing this essential clearing project, we strengthen the resilience of our stormwater systems, significantly reducing the risk of local flooding across vulnerable watershed areas.
- This project shows the commitment of Dunedin to create a sustainable environment that safeguards property, enhances drainage performance, and preserves the natural beauty of our community.
Page last updated: 10 Jul 2026, 08:53 AM
