Overview The City of Dunedin is excited to announce a transformative project at the site of the former City Hall property at 542 Main Street. After moving operations to the new City Hall on Louden Avenue in March of 2023, the City identified the old building as functionally obsolete and unsuitable for future municipal use. This project proposes converting the space into a thoughtfully designed pocket park that prioritizes preserving the property’s grand oaks, integrating open green space, and enhancing downtown amenities. The vision for this park reflects the City’s commitment to sustainability, community connection, and downtown revitalization.
Key Project Features With a focus on creating a welcoming respite in the heart of Downtown Dunedin, the proposed park will feature:
An inviting mix of seating, lighting, and landscaped open areas supported by upgraded facilities like public restrooms, in Phase 2.
Strategic design elements will preserve parking and incorporate historical details such as brickwork and columns, paying homage to Dunedin's architectural roots.
As the plans progress, community input will play a vital role in shaping this space to reflect the needs, values, and aspirations of residents, visitors, and local businesses alike.
Landscape Architect: Jonathan Toner/Terra Tectonics Design Group, Inc
Consultant: Mason Bleu & Associates
Budget Phase 1 Park Construction Funding Sources:
CRA: $300,000
Penny for Pinellas: $300,000 Cost Estimates
Earthwork, Site Improvements, Landscaping and Irrigation
Permitting, Insurance & Bonds, Contractor General Conditions
Total: $500,000
Phase 2 Park Bathrooms Construction – Cost Breakdown Standard PS-033 Restroom Bldg: $232,736 Shipping: $34,910 Installation: $58,423 Crane Cost: $23,274 Alcove with Drinking Fountain & Bottle Filler: $22,343 Covered Entry with Posts: $35,980 Brick Wainscott (Building & Posts): $29,790 Lap Siding: $17,223 Sub-Total of Upgrades: $221,943 ** Total Restroom, Site Prep, and Utilities: $454,679 **
Overview The City of Dunedin is excited to announce a transformative project at the site of the former City Hall property at 542 Main Street. After moving operations to the new City Hall on Louden Avenue in March of 2023, the City identified the old building as functionally obsolete and unsuitable for future municipal use. This project proposes converting the space into a thoughtfully designed pocket park that prioritizes preserving the property’s grand oaks, integrating open green space, and enhancing downtown amenities. The vision for this park reflects the City’s commitment to sustainability, community connection, and downtown revitalization.
Key Project Features With a focus on creating a welcoming respite in the heart of Downtown Dunedin, the proposed park will feature:
An inviting mix of seating, lighting, and landscaped open areas supported by upgraded facilities like public restrooms, in Phase 2.
Strategic design elements will preserve parking and incorporate historical details such as brickwork and columns, paying homage to Dunedin's architectural roots.
As the plans progress, community input will play a vital role in shaping this space to reflect the needs, values, and aspirations of residents, visitors, and local businesses alike.
Landscape Architect: Jonathan Toner/Terra Tectonics Design Group, Inc
Consultant: Mason Bleu & Associates
Budget Phase 1 Park Construction Funding Sources:
CRA: $300,000
Penny for Pinellas: $300,000 Cost Estimates
Earthwork, Site Improvements, Landscaping and Irrigation
Permitting, Insurance & Bonds, Contractor General Conditions
Total: $500,000
Phase 2 Park Bathrooms Construction – Cost Breakdown Standard PS-033 Restroom Bldg: $232,736 Shipping: $34,910 Installation: $58,423 Crane Cost: $23,274 Alcove with Drinking Fountain & Bottle Filler: $22,343 Covered Entry with Posts: $35,980 Brick Wainscott (Building & Posts): $29,790 Lap Siding: $17,223 Sub-Total of Upgrades: $221,943 ** Total Restroom, Site Prep, and Utilities: $454,679 **
Page last updated: 30 Jul 2026, 07:57 AM
"We are excited to have a park to anchor the east end of Downtown Main Street with additional greenspace and amenities."
Bob Ironsmith
Director of Economic & Housing Development
Planning and Initial Design
Grand Oak Park has finished this stage
Winter 2023
Design Contract Awarded
Grand Oak Park has finished this stage
Spring 2024
Parks & Recreation Advisory Committee Presentation